I. Project Initiation
- Conduct comprehensive requirement analysis including product quality standards, production efficiency targets, and environmental constraints
- Establish clear project scope and technical boundaries
II. Product Analysis
- Evaluate manufacturing processes, dimensional tolerances, and material characteristics
- Collaborate with clients to define operational parameters, safety requirements, and site-specific technical specifications
III. Conceptual Design
- Develop preliminary equipment schematics (overall layout and detailed section views)
- Create mechanism descriptions, operational sequences, and technical parameter documentation
- Conduct feasibility assessment of core technologies
IV. Design Review
- Cross-functional team evaluation covering:
- Technical feasibility and risk assessment
- Cost-benefit analysis and ROI projections
- Production capacity verification
- Structural integrity validation
V. Design Optimization
- Address issues identified during review process
- Implement necessary modifications to improve performance and reduce costs
VI. Client Approval
- Present finalized design package for client confirmation
- Incorporate final client feedback and obtain formal approval
VII. Engineering Development
- Generate detailed manufacturing drawings (assembly and component level)
- Specify precision tolerances per national standards
- Select actuators, control components, and auxiliary systems
- Create bill of materials and procurement documents
- Develop operational manuals and maintenance procedures
VIII. Engineering Validation
- Conduct thorough design review focusing on:
- Dimensional accuracy and fitment
- Structural stability and load-bearing capacity
- Control system compatibility
- Safety compliance
IX. Component Manufacturing & Sourcing
- Fabricate custom components
- Procure standard parts and subsystems
X. Quality Inspection
- Perform incoming quality control for all components
- Verify dimensional accuracy and material specifications
XI. System Integration
- Mechanical assembly per engineering drawings
- Electrical and pneumatic system installation
- Control system configuration
XII. Commissioning & Testing
- Conduct functional testing and performance validation
- Fine-tune parameters for optimal operation
- Perform run-off tests under production conditions
XIII. Packaging & Delivery
- Prepare equipment for shipment
- Provide installation support and operator training
Key Considerations for Custom Automation Design
Process Understanding
Engage with production operators in addition to engineers to identify practical challenges and improvement opportunities in legacy manufacturing processes.
Comprehensive Requirement Definition
Document detailed specifications including:
- Manufacturing
- Equipment performance parameters
- Total cost of ownership constraints
- Comparative analysis with conventional manufacturing methods

Optimal Workstation Design
Prioritize:
- Operator safety and ergonomics
- Maintenance accessibility and cleanability
- Modularity and future expansion capability
This stage fundamentally determines equipment performance and usability.
Component Selection Strategy
Balance specialized functionality with:
- Upgrade potential for future requirements
- Standardization for reduced maintenance costs
Continuous Improvement